Sunday, February 27, 2011

What Would Herpes Of The Chest Look Like

DEMOLITION OF TWO BUILDINGS DOOR HAL

A permit application was reviewed by conciliation committee for the demolition of two buildings at the Porte de Hal (number 9 and 10). These are the two white houses on the picture above. The applicant proposes to reconstruct two buildings clearly that the templates are aligned with those of adjacent buildings. It is unlikely that these guns are restored for the occasion ...

Both single-family homes would become 3 1 bedroom apartments, 4 apartments with 2 bedrooms and 3 apartments with 3 bedrooms).

The consultation, which took place August 31, 2010 postponed its review pending additional information. The IBGE has drawn attention to the need for an inventory "asbestos".

A new consultation has taken place January 25, 2011. Here [soon] what to remember.

When Is Cervix Low Hard But Open

VILLO STATIONS MANAGEMENT: THE NINE (FINALLY)

Recently, several billboards JC Decaux, include the top (he really must know) an indication in real time on stations Villo. The message indicates the nearest station (direction, distance, address) and also the number of bikes and availability. Useful. When is a generalization of the system? And greater too.

Blue Print For Dune Buggys

PLANNING: NEW SITE OF THE WORK AREA

The Brussels-Capital gave up quite a bit of information in urban planning. Unfortunately, for getting together, it would sometimes get up early. Information relating to planning were indeed scattered over five different websites. For several days, a cleansing took place and it's on a single site that all news, events, info on the subject are gathered. And, my goodness, it's pretty damn good. You can visit here .
Overall, the site of the Region has also been a facelift beneficial. Just look at yourself here.

Friday, February 25, 2011

Church Anniversary Ideas Church

VERHAEGEN STREET: THE JOINT GUARD YEAR REUNION

On 23 February, the Defense Committee of Saint-Gilles had invited the inhabitants of the Rue Théodore Verhaegen (and around) to come express their concerns and express their questions regarding proposed works - soon. Traders, especially, have expressed concern. A meeting had already been initiated by the municipality on February 9 in order to explain the project outline.


Many Saint-Gilles did not have the opportunity to attend this briefing, and after numerous calls from residents, we felt good reoffend evening. On this occasion, we asked Mr. Carlo Luyckx (Alderman Mobility and Public Works) and Mr Patrick Debouverie (Alderman of Economic Development) to give the public any explanation. Both accepted the invitation and made many reassuring answers - even if some points remain unclear.

What was the challenge of meeting?

We had heard that by late 2011, the sewers of the street were Theodore Verhaegen be completely renovated. Both the houses connection to the main sewer under the road are concerned. In the same vein, the street will be resurfaced. New tracks will be laid, the redesigned bus shelters and bike paths and sidewalks. The high street will be one way: we can get past the barrier but the vehicles will no longer back from the street Sterckx.

The objective of the meeting was well stated on the invitation:

Many merchants and residents fear the work that will last many months. What are these concerns and challenges? How the district will operate for this work? The meeting will prepare for the consultation to be held March 22 next to the town.



Many residents and merchants have responded to the invitation. The packed house was very attentive yet heard a number of reflections to reassure everyone. The situation, it was said, will not be chaos feared. The town, constrained by the region to implement a number of developments (eg the way "imposed" by the STIB) makes every effort to find solutions to problems announced.

What are these big news?

1. About one-sided:
The town is no obvious utility of this way and have regrets - probably - the measure applied. However, counts of passing vehicles do not indicate the necessity of making sense of this unique segment. Even more than at any time of day (except at 8 o'clock in the morning), the tram is idle. This will have the same county, another negative consequence: that at certain times to block the bus 48 and tram 97! The way would also aim to reduce the traffic.

The town has launched a test to see "real time" - and especially before the consultation - how it will work in the field. The test will last three months (and will be continued after the consultation).

Also note that the street is the Fort, also one-way during this period as a test! Comprehensive program so that it may cause a famous bedlam. The Carnival period will probably limit the confusion test size. The public has been asked whether the period (with school holidays) will be enlightening ...


But what about the market this weekend? trucks will have to come in the Rue du Fort at the top. This issue has yet to be resolved. Many traders fear

however, that this work may "kill" local economic activity.

2. The impact of work on economic development:
Again, the municipality has taken the bull by the horns by requesting a study of incidence at Atrium (and also the probable traffic congestion of 48 and 97). This report will be ready for consultation and attached to the file.

3. The impact on businesses

Coordination of the work has been at any time required by the municipality. Not allowed to open and close and then open the street again. The town wants to secure supplies at any time. Traders will be sought and given adequate notice. The municipality is committed to finding solutions with them.

4. A daily call number and an antenna site:
In case of problems, there will be a means of contacting a cell that can respond and react quickly. The public also requires an antenna site, as is often the case in the work of the STIB. It will also ensure a safe home for people who do not speak - well - French.

5. An assistance unit will be established.
Its mission will be to stay in constant contact with residents and merchants to ensure the smooth running of operations. It is she who will contact the businesses concerned to review before any new phase of work what possible solutions would be to implement.


6. What about the priority right onto Theodore Verhaegen? The Region wants

actually prefer this option.

7. The passages Pedestrian: will require special attention to the safety of all. And all tram stops are arranged after the crossroads.

8. Customers will have access to shops.
Everything will be done to ensure that shops and stores are accessible.

9. Compensation for traders.
We have already raised this question in the blog. Everything will be implemented, we were told, so that trade suffers as little as possible of the situation. Was also addressed the issue of inspections AFSCA. Traders of the food chain and hospitality urged that the work will not bring harm to security issues and - most importantly - hygiene.




10. What about cycling?
The GRACQ (Cyclists Daily) is a non-profit and no affiliation is to focus on promoting cycling as a means of travel. The association has also organized a meeting of citizens about the place reserved in the project cycle. We did not have concrete echo of this evening.

11. The work schedule?
First, the sewer replacement. This can be done in late summer. In all cases, there will be proper coordination between different operators. By cons, we do not yet know where to begin the work (up or down?). The only certainty is that the connection of sewers to homes will be without much effect on traffic.

Some points were not discussed due to time constraints. For example:
  • The parking card Will it extended? Parking will be more complicated. Local residents will they park "at the same rate" their car further? What will
  • the exact route of the shuttle bus?
  • Is there no way to maintain a tram on the street ... Théodore Verhaegen even during the work?
  • Bethlehem Street from the corner Dethy / Chaussée de Forest / Vanderschrick be redesigned to accommodate a bus shelter. She will not give the street before branching off Theodore Verhaegen but to the other side of the square of Bethlehem. We had already spoken. A wonder how many times this place is still undergoing changes ...

final point: the amount announced deals with all of the work was around 8.8 million euros. During the evening, we talked about 11 million. Provided that the result, whatever it is in is worth the shot.

The closing remarks of the President:
Thanking the Assembly and elected to the quality of debate, the Chairman proposed the meeting to occur in the commission of massive concert on Tuesday 22 mars 2011-9 hours and ask to be heard. He also asked the commune to return - through the Committee - a request for those who can not attend. A delay was granted to allow this.



Our team has contacted all street traders involved in this spirit. The result: we have collected details of about 50 people wishing to speak that day. Hope that the spirit of synthesis and concision are also go ...

Monday, February 21, 2011

Highly Coupled Module Difficullt To Test




Choeurisma is a vocal four-part mixed voices, founded in 1993 by Serge Medawar.

During the 90s, therefore, the young chief involved eight amateur singers to form the vocal ensemble Choeurisma. Vigneault to Rachmaninov, Fauré Duruflé, to Britten and Handel, the choir has expanded its repertoire, won many fans ... and took up the ranks! He holds a master's degree in choral conducting at McGill, Serge Medawar, led during all these years, with heart and sensitivity, fifty singers. Since

September 2009, Chef Jean-Charles Côté, lent a hand and replaced Serge Medawar in choral conducting. In September 2010, Jean-Charles finally takes the torch while Serge is dedicated to piano lessons (while thinking up new projects choral) ...

In January 2011, the chorus of Jean-Charles is named Chorus Vox Luminis Montreal. Follow their adventures on their new blog .


Fluid In Pouch Of Douglas

The Lord is my light

The Lord is my light, HWV 255, "Chandos Anthem No. 10" by Handel, performed by The Sixteen (on Naxos)


Lien direct pour les abonnés de l'Université de Montréal (si votre navigateur est configuré avec le proxy de l'U de M, vous n'avez qu'à entrer votre identifiant et votre mot de passe).

Les abonnés de la Bibliothèque nationale du Québec (La Grande Bibliothèque) peuvent écouter en ligne (sur le site de Naxos), cette "oeuvre" en version intégrale. (Vous n'avez qu'à cliquer sur le lien puis à entrer votre no d'abonné et votre mot de passe. Cochez la pièce dans la liste. Cliquez sur "Play selection" à gauche de la page.)

Des fichiers MIDI each desks are available here.

Do You Get An Erection During Waxing

230. Martha and the Vandellas "Dancing in the Street" (1964)

During the 1960s, very violent riots shake the black ghettos of major American cities. During the summer of 1964, a young Black man in Harlem was shot by a white police officer, and immediately the ghetto ablaze. In 1965, following a police control that goes wrong, the black ghetto of Watts in Los Angeles, has six days of looting. Arson, the use of Molotov cocktails cause considerable damage in the city (30 million) and are accompanied by very violent clashes with police. The calm that comes only through the sending of 14,000 National Guards, but the human toll was heavy: 34 dead 900 injured, 4,000 arrests.

Char in the streets of Newark (New Jersey) in July 1967. The 12, a young black man is arrested for a traffic offense. A rumor spread that he was allegedly beaten to death by police. The city then experienced four days of violence. The mob set fire, looting shops and attacking the police.

During the summer of 1966, Chicago, Cleveland, San Francisco experiencing race riots like that cause the death of 7 persons and over 400 are injured. The real guerrillas Urban breed and marred most major U.S. cities during the summer of 1967, by far the most "hot" and the deadliest of the decade. There are 26 dead in Newark, New Jersey, but Detroit knows the most serious incidents. The Motor City suffered six days of rage and regret 43 dead, 467 injured, over 7,200 arrested, 1,700 stores were looted and burned 2,000 buildings.

* a volatile setting.
Nicole Bacharan (cf. sources) is back on the gear, which led to the riots: " Each of these tragic events, as anarchic unpredictable and uncontrollable as they seem, followed a pattern almost identical: a period of extreme heat, which the inhabitants of the ghetto, private swimming pools (...), could find no relief; an incident with white police officers , whose inhabitants felt the forceful presence as a foreign occupation, a crowd quickly gathered, throwing molotov cocktails and other projectiles, and within hours, the ghetto was ablaze. "

The one Life devoted to the riots in Newark," insurgency predictable. After the four days of rioting, we deplore 26 dead, 1,500 injured, thousands of arrests and millions of dollars in damage.

These riots are contemporary two great laws ending racial discrimination in institutional: the Civil Rights Act adopted in 1964 prohibits discrimination in public places, the Voting Rights Act of 1965 prohibits legal stratagems to prevent blacks from voting. These last accessed finally a full citizenship. Why under these conditions these unprecedented explosion of violence, even though significant advances were achieved in terms of civil rights? President Lyndon Johnson, who has done much in this area than all his predecessors, sees the riots as a betrayal. In the aftermath of the Watts riots, the president asked incredulous Martin Luther King: " How is it possible, after all we've accomplished? The world he lost his mind? . In an emergency, it allocates substantial resources to federal agencies on site, which does not prevent the violent summer of that happen again in 1966, 1967 and 1968. This however, is only apparently paradoxical. A 1966 report on the situation in Watts proves that " nothing had changed since the previous year and that the services involved in the war against poverty, caught in the administrative squabbles were unable to set priorities . " [Cf: Doors, p253]
Young rioters in Los Angeles, Newark and Detroit did not feel concerned by the laws of 1964-65, which relate primarily African-American segregationist South. " political and social programs advocated by the 'Great Society' Johnson had strengthened the hopes and expectations Black so that the riots reflected a disappointment and resentment of their low impact, and a white society that was blocking the aspirations higher than the previous generation. The discontent came much of the gap between the 'progress' and the end of segregation trumpeted by the government and the reality of discrimination experienced daily. "[ie: NDiaye p100) Police brutality in this case, the persistent discrimination in housing and employment, social difficulties are factors triggering riots.
The situation has even tended to deteriorate during the decade given the escalation in Vietnam and the rise of Black Power .


A Life magazine 27 August 1965. The Watts riots broke out August 11, 1965, just five days after adoption of the Voting Rights Act . Any part of the arrest of a black motorcyclist in a drunken state. Attacked by a group of onlookers, the white police officers called for reinforcements, to the fury of a crowd of increasingly hostile. The ghetto ablaze for six days. A crowd of 30,000 people in the looting starts white neighborhood stores whose owners are accused of selling their products at inflated prices. During the sack after, shots were fired. Appraisal: 34 dead, over a thousand injured, four thousand arrests and hundreds of buildings destroyed.


* Music of the Soul.
The rioters taking on board the slogan "Burn Baby Burn " ("burn, baby, burn") in reference to the bombing with napalm in the Vietnam conflict. It is also the favorite expression of Magnificent Montague, truculent dj a radio in Los Angeles, KJFG which and launches his favorite pieces of soul. This music, too often equated with ballads marshmallows harmless, yet very necessary as the musical idiom of the civil rights movement during the 1960s. Beyond its glamorous image, " soul participates actively in the development of pride, daring, rewarding a definition of blackness that were previously lacking. " [ie: Train] The term soul originally used by jazz musicians, music transcends its meaning and soon enter into the vocabulary of the ghetto to become synonymous with blackness (blackness). The Motown
The plant in Detroit tubes, led by Berry Gordy, is quite representative of this evolution. Some label artists (Marvin Gaye, the Temptations) gradually incorporate a social content to their repertoire, without being confined to romantic ballads of their debut.

Store ransacked, Newark, July 1967.

Greil Marcus notes with relevance Mystery Train that until the affirmation of the civil rights movement and riots " black voices channeled the emotions aroused by political exclusion and social despair in songs with the subject of sexual or romantic tragedies. "In fact, the cycle of violence initiated by the riots contributed to subvert the message, hitherto harmless, some soulful songs like the Dancing in the Street Martha and the Vandellas. Thus, unknown its writers and performers, the song itself as a hymn during the riots that inflame the American ghettos from the summer of 1964.
Originally there yet nothing subversive or politically engaged in this piece. The song announced a lifestyle marked by a desire to occupy public space, in the euphoria collective dances. Dancing in the Street inspired by the words of its creators, games for kids and teens snort around the hydrants during the hot days were experienced by the major U.S. cities. The summer riots
give new meaning to this song urging people to "take to the streets . Rioters appropriate these words euphoric. Singer Martha Reeves says however that it was not a call to violence: " is quite the contrary we want to encourage the crowds. Our message is clear: All We Need is music, sweet music ... We want everyone to come down the street to dance and socialize, not to fight. "Despite the caution of radio programmers who are reluctant to pass the song, the title was a huge success and moves to second place in the American charts.


* Martha and the Vandellas.
Born in Alabama Martha Reeves grew up in Detroit in a family of eleven children whose father was a pastor in a Methodist Temple. In 1960 at age 19, she founded The Del-Phis, vocal quartet spotted and signed by the label of Chicago , Chess. Success not to go, but Martha managed to get hired as secretary to the Tamla Motown.
The young woman does not flourished in this task, but gradually comes to his hole. With other Del-Phis, it provides backing vocals on two of the first single from Marvin Gaye. In September 1962, she seized his chance, replacing Mary Wells at short notice, then the label featured singer on the recording of the song I'll Have To Let Him Go . The Del-Phis were renamed Martha & the Vandellas. The group quickly becomes a huge success, thanks to the quality of his interpretations and the quality of the compositions of the trio's magic Motown Holland Dozier Holland. Martha Reeves is also in a relationship with Brian Holland reserving it for tidbits. The tubes are connected: Memories then Heat Wave 1963. Yet the reports of the singer with the label boss, Berry Gordy, proved stormy. Despite the success of the Vandellas, he prefers his new signing, another female vocal trio The Supremes , head which quickly becomes its Diana Ross.

Martha and the Vandellas.

Both teams play yet in different stylistic registers. The Supremes favor sophistication, while the Vandellas offer pieces of a remarkable intensity, stripped of any frills. In June 1964, the first won their first major success with Where Did Our Love Go . Between the two teams the competition is launched. In July, Vandellas retaliate and triumph with Dancing In The Street, written by Mickey Stevenson and Marvin Gaye. Concentrated energy, the title is an irresistible incitement to dance whose rhythm is assured by a chain of bicycle struck on the floor of the studio, lined drums that accentuate the time! The choirs meet echoing the lead vocals performed by Martha Reeves. This huge success nevertheless sounded like a swan song for the trio. The reports saw sour between Berry Gordy Martha Reeves and sinking into a deep depression. Nevermore singer will not encounter such a success. It still leaves a few sublime songs including Dancing in the Street tube unstoppable soundtrack surprising ghettos aflame.





Dancing In The Street Calling

out around the world
Are you ready for a brand new beat?
Summer's here and the time is right
For dancing in the street
They're dancing in Chicago (dancing in the street)
Down in New Orleans (dancing in the street)
In New York City (dancing in the street)

All we need is music (sweet music)
Sweet music (sweet music)
There'll be music everywhere (everywhere)
There'll be swinging and swaying
And records playing
Dancing in the street

Oh, it doesn't matter what you wear
Just as long as you are there
So come on, every guy, grab a girl
Everywhere around the world
There'll be dancing
They're dancing in the street
(Dancing in the street)

This is an invitation
Across the nation
A chance for folks to meet
There'll be laughing, singing
And music swinging
Dancing in the street
Philadelphia, PA (dancing in the street)
Baltimore and DC now (dancing in the street)
Can't forget the Motor City (dancing in the street)

All we need is music (sweet music)
Sweet music (sweet music)
There'll be music everywhere (everywhere)
There'll be swinging and swaying
And records playing
Dancing in the street

Oh, it doesn't matter what you wear
Just as long as you are there
So come on, every guy, grab a girl Everywhere Around the World

They're dancing They're Dancing in the

street (Dancing in the street) Way down

in LA, Every Day
They're Dancing in the Street
(Dancing in the street)
Let's start a big time now, get in time
With Dancing in the Street
(Dancing in the street)
Across the ocean blue, me and you
We're Dancing in the Street
(Dancing in the street)

***************

Dancing In The Street

I appeal everywhere
Are you ready for a brand new beat?
Summer is here and it good times
to dance in the street.
They dance in Chicago (dancing in the street)
in New Orleans (dancing in the street)
in New York City (dancing in the street)

Everything we need is music ( good music)
Good music (good music)
There will be music everywhere (everywhere)
There will be swaying, writhing
and discs that will play
"Dancing in the Street"

Oh, it does not matter what you wear
as you are present
So come on, every guy, hook a girl
worldwide
There will be dancing They're dancing in the

street (Dancing in the street)

This is an invitation
In the entire world population
A chance for people to meet
There will be laughter, songs and music
haunting
Dancing in the Street
Philadelphia (dancing in the street)
Baltimore and the District of Columbia (dancing in the street)
not forget Motor City (dancing in the street)

Everything we need is music (good music )
Good music (good music)
There will be music everywhere (everywhere) There will
scales, controsions
and discs that will play
"Dancing in the street

Oh, it does not matter what you wear
as you're here
So come on, every guy, hook a girl
worldwide
There will be dancing
They dance in the street
( dancing in the street)

From the depths of Los Angeles every day
They dance in the street
(Dancing in the street)
start a party now,
dancing in the street
(Dancing in the street)
D one across the ocean blue, me and you
We dance in the street
(Dancing in the street)

Sources:
- Jacques Portes, "Lyndon Johnson . The paradox U.S. "Biography Payot, 2007.
- Pap Ndiaye," American blacks. In march for equality "Discoveries Gallimard, 2009.
- Greil Marcus" Mystery Train "Allia, 2001.
- Christophe Train:" The music angry ", Press of the National Foundation Political Science, 2008.
- Yves Delmas, Charles Gancel " Protest song. Protest songs in America in the Sixties "Textual Editions, 2005.

Links:
- Other artists on the Motown histgeobox .
- The dig pop history: " Dancing in the Street .

Friday, February 18, 2011

Playpokemon Crystal Online

"VERHAEGEN" THIS WEDNESDAY

The work announced by the end of the year across the street Theodore Verhaegen will cause large disturbances in the neighborhood. The tram, for example, no longer pass between the Barrier and Fonsny. This will require patience and other habits ( rerouted, for example ) for students, workers, residents, merchants, ...

A trial from 28 February, the one-way street which starts Sterckx to the Barrier. We had announced recently:

a meeting is scheduled at the initiative of the Defense Committee of Saint-Gilles with traders (and people) involved
this Wednesday, February 23, 2011 at 19:30 hours.
This happens
Pianofabriek the Rue du Fort 35 (Arenberg room).
We
have invited the deputy mayor for economic development, and that Mr. Debouverie in charge of mobility and public works, Carlo Luyckx. The two aldermen have confirmed their presence.

This is an opportunity to present the concerns of each other and ds and share practical difficulties that traders (but not only) will meet for sure.

Thursday, February 17, 2011

Preparation H Helps Reduce Waist Size

GOAL SUCCESS



The 55 houses so Dethy street activity remedial school.
that municipal service is a huge success. Soon, another structure opens in the neighborhood. More exactly opposite, at 31 street Lisbon - where the team is currently working communal street educators. This is one of the visible achievements of the district contract Alsemberg Park.

Enlarged Testicle After Hernia Surgery

NOTICE OF PUBLIC INQUIRIES TO GROUND


Each application for planning permission or environment is to be posted in the neighborhood. These are the famous red posters that bloom around certain neighborhoods.
Unfortunately, some vandals seem to enjoy the sack. The result? Citizens can find the opinions of any work in their neighborhood. It is a right and democratic citizen who is here under attack.

Photo: the announcement of the consultation on the future work of the street Theodore Verhaegen often find themselves on the floor. And even torn in this case!

How To Write A Spanish Sympathy Note

29 RUE DE ROME: A SITE TO STOP

A.
Our inspectors are investigating.

Apparently the developer to renovate the building located at 29 rue de Rome wanting to transform a single family home in house reports did not even bother to wait for the opinion of the Commission for Coordination to start work - heavy. If so, it's a scandal! The town Saint-Gilles and the Royal Commission for Monuments and Sites to ensure grain and stopped dead site.


B.
Our inspectors investigated.

The planning department tells us that this is not a listed building but in a mansion. People have actually started work without obtaining a permit. Consultative Commission of December 14 was postponed his notice until a site visit. During this visit to what was already a building site, the decision to halt the current work was taken. The opinion of the town was finally unfavorable to the project.


The case is currently under investigation: it will be sent to the Brussels Region. It will have 45 days to give its opinion. Then, this notice will be sent to college in that it will take 15 days to render a final opinion.

In summary, for a final opinion, it will have to wait about 2 months. It is always possible that the applicant changed his plan at all these procedures - or even withdraw his project.

Anyway, if the opinion is negative in the end: we can assume that there will be a minimum fine and the worst (so to speak) the owner shall rebuild the demolished portions in the state where they were before the license application.

C.
was worded Here's how the permit application submitted at the public inquiry of 10/11/10 to 24/11/10.
Applicant: Mr & Mrs Despoelberch - Vilariça
The request is for changing the number and distribution of housing volume changes, change of use and installation of parking.
Existing situation: Single Family
Projected situation: 1appartements + 3 1 bedroom apartments 2 rooms + 1 apartment 3 bedrooms.
Transforming an apartment building into apartments with extension at the ground and first floor and creation of terraces at the rear. Creation of dormers to front and rear of the building to street. Transform the store / depot abandoned in the back (rebate) into 2 apartments with no change in volume. Demolition of the entire roof between two buildings and landscaping, terraces and a pergola for 3 parking spaces created.

D.
The opinion of the Commission's Consultation 14/12/10:

Whereas during the public inquiry which ran from 10/11/2010 to 24/11/2010
, the next mail came on behalf of the Mayor and Aldermen:
Guy Sohy Rue de Rome, 31 1060 Brussels
Winnepenninckx Mr. Rue de Rome, 27 1060 Brussels
Mr. Meulemans Rue de Rome, 27 1060 Brussels
Bruiz Mr. Rue de Rome, 27 1060 Brussels

STATEMENT FILE
Located: SAPP: residential
in area of cultural, historic, aesthetic or beautification
border in core business in
variation point of mixed
along a space structuring
PPAS: None.
RCU: none
Protection Area: Perimeter Protection: "Old House Hoguet" street
Rome, 24-28. 29/10/1998 AG.

EXCEPTIONS:

Notwithstanding s. .4 of Title 1 of RRU (depth of construction)
Notwithstanding s. .6 of Title 1 of RRU (roof - high)
Notwithstanding article 13 of Title 1 of RRU (maintenance of a permeable surface)
derogation to Article 10 of Title 2 of RRU (net area illuminating)
derogation to Article 3 of Title 2 of RRU (minimum area - area of habitable space
)

Submitted to the opinion of the Consultation Committee and special measures for advertising
:

derogation the art of Title 1 of .4 RRU (depth of construction)
Notwithstanding article 13 of Title 1 of the RRU (maintenance of a permeable surface)
Notwithstanding s. .6 of Title 1 of RRU (roof - high)
application of the special requirement 2.5.2 ° SAPP (changes in urban characteristics
constructions)
application general requirement of 0.6. SAPP (acts and proceedings affecting
interiors of islets)
application of art. 153, CoBAT (exemption planning regulations)
application of art. 237, COBAT (protection zone of a well classified (actions and works
changing perspectives on the property or accommodation from the latter))

Considering that the property is situated in residential area of the Regional Plan allocation of land
arrested by Government Decree of 3 May 2001, and in the scope of protection of classified property
located 24-28 rue de Rome

Considering that the property is listed in the inventory of architectural heritage (building
before 1932);

Considering that the request is to amend the number of units (division
single-family homes at the front in 3 places) The volume change
(extensions and dormers to the front building, pergola and terraces within islet
the rear building), the alternative use of the rear building (remodeling
2 units) and the creation of 3 locations Indoor parking island;

Considering that during the investigation Public held from 10/11/2010 to 24/11/2010
, 4 complaints were filed and include: •
creating indoor parking island (noise and smell
, Impact of the pergola)
terraces • 1st and 2nd floors of the building before (negative views)

Considering the unfavorable opinion of the CRMS: interventions with domestic
as a consequence of altering profoundly the mansion ( mezzanine in between
cochere particular), sites Parking not satisfying for
housing;

The Committee therefore issued a DEFERRAL NOTICE pending a site visit.

The owners did not actually wait for the final opinion of the town and the region or even the visiting officials. Let alone the licensing - the process is underway.

Egale Sportscooter Scooter Wheels

ALSEMBERG PARK: ADVANCE CA (1)

We publish as soon as possible an account of the BILD of February 16, 2011. We invite you to already see the two other sections below (one is a summary in Dutch du projet [localise essentiellement aux abord de la rue du Fort - PARK ALSEMBERG: CA AVANCE EN NEERLANDAIS (2)], l'autre est plus complet [PARC-ALSEMBERG: CA AVANCE (3)]).

Mini Stroke Flushed Face

PARK-ALSEMBERG: CA ADVANCE IN DUTCH (2)

PARTICIPATION - SENSITISATION - COHESION
IN AND AROUND THE Fortstraat

following text in a Same mount a project to which vesrschillende associations since last spring (in 2010, therefore) have worked. The French text gives a full view.

CODES, CAFA and the Piano Factory work together on a project under section 5 of the district contract for the participation of Alsemberg Park citizens to increase their awareness and involvement in the plans of the district contract.

Project.

Participatory democracy does not come automatically. Many people have a little push needed for them to participate in the policy. A house-to-door leaflet is not sufficient for many people across the line to draw, especially the socially disadvantaged.

We are committed to the people to embark on the street, the middle classes and the clubs where they meet. We look for creative people to reflect on their immediate surroundings. We want

starting from present and past people inquiring about how they like their environment zien evolueren in de toekomst. We willen het ritme van de wijk in beeld brengen en verhalen van hoe het vroeger was optekenen. Tegenover de bestaande en vroegere situatie peilen we naar de dromen, idealen en frustraties van de bewoners en gebruikers van de Fortstraat.

Door het opzetten van interventies die uitmonden in een feestelijke event.
Door het opzetten van acties dier sensibiliseren voor maatschappelijke participatie en het samenleven in diversiteit.
Door het versterken van het netwerk van individuen, verenigingen, organisaties en gemeentelijke diensten.

FASE 1: Voorbereiding en netwerkvorming
Mei- September 2011

We werken een communicatieplan uit which we have different types of users and local residents identify and consider how we best address them. We are thinking of the children and seniors, to residents with a vision of urban development, visitors to the market ... Extend Partnership: fe Maison des Enfants, Atelier du Web, House of Sustainability ...

We make an inventory of different perspectives: retail and catering services, conveniences and inconveniences of mobility, cleanliness and safety, family friendliness, the quality of living and bring the current state of multimedia in pictures.
We develop tools to make communication easier and more efficient: a neighborhood newspaper, a digital map the street, a blog, posters, a stand on the market ... We
launch in September 2011 a targeted and differentiated call to all concerned parties to submit their ideas.

PHASE 2: Appel aux Idées
October 2011 until May 2012

Actions to audiences, appealing to key people, collaborations with local organizations, surveys on the market, (digital) local newspaper ... ...

PHASE 3: street party in May 2012


In third stage the different paths traveled participatory presented and reviewed at a neighborhood party. The possible future interpretations of Fortstraat for evaluation presented to visitors and passers-by. With this aim we have a multiplier effect: the participation is widened and deepened on the basis of already collected material.

PHASE 4: Reporting
June 2012

Achieving a final report of the three phases for the municipality. This report will be a broad-based future content of the environment and Fortstraat offer during a closing event.

Scrapbook Barbie Invitation

ALSEMBERG PARK: ADVANCE CA (3)

Le Contrat de Quartier "Parc Alsemberg» 2010 -2014 a Demarre officiellement doit se le 11/01/2010 et le 10/01/2014 terminate. L'assemblée générale elected representatives of residents to the Local Integrated Development (BILD).

From the beginning, residents associations and the perimeter may have arisen to be involved in the conduct of the project. This Wednesday, February 16, 2011 took place a BILD reports of the progress of the project. The least we can say is that many positive things are in place.

the occasion of this meeting - in which the Region was present as the research department, residents and associations have submitted a project. This is discussed since spring 2010. We'll deliver it as was presented (the passages in red were not included in the text given: it was written after the meeting).


Introduction

We had the opportunity to meet several times since March 2010, the town, residents, associations, the Office of Study for the Contract Quarter "Park Alsemberg »2010 -2014. We got in contact with several local committees (Dethy street, rue Jean Robie Street Crickx, rue de Lausanne), residents and local artists. It appears that several proposals and wishes of the inhabitants were issued.

We were able to express in December last year the broad guidelines worked by dozens of people and the various associations involved in perimeter.

Several sketches in this project were proposed. Generally, they meet the wishes and concerns of citizens. We surveyed several areas:

The peanut (the six corners on the corner of Dethy & Prague);
The 2 benches (at the junction of the roadway of Forest Street and Theodore Verhaegen)
The boat (at the intersection pavement Forest and Rue de la Perche)
Fort Street (and the streets of Celery and Fortifications)
Street Villas (at the intersection of the street of Garibaldi and the Chaussee d'Alsemberg)
The tip of the rue Jean Robie;
barrier and heritage of the town;
And the street of Lisbon.

Some neighborhoods are more mobilized than others: there may be a job to do in neighborhoods less active.

Based on what the people we have expressed the wish expressed at the BILD to consider 5 points:

1. A program Basic - guidance;
2. Completion dates;
3. A procedure for maintaining regular dialogue between the municipality and the inhabitants (the fulcrum of BILD and GA);
4. Coaching associations;
5. A guideline budget.

What people want directions?

1. The peanut (the six corners on the corner of Dethy, Lisbon & Prague)
Two areas of remediation for graduate school (31, rue de Lisboa in addition to the ground floor of the 55 rue Dethy) are welcome;

main proposal: a monumental bench around the tree.

2. The 2 banks
(at the junction of the roadway of Forest Street and Theodore Verhaegen)

Young people want to play (football ...) or at least gather there,
People criticize the coffee shop, From
verdurisation / revegetation,
performances in (respect) cleanliness,

main proposals: a bench decorated monumental mosaic or ceramic by a local artist.

3. The boat (at the junction of the road from Forest and de la Pole)

A decorative furnishings evoking Portugal (mosaic?)
From verdurisation / revegetation,

Residents have proposed "The Boat" chiosque one (but not like the place Bet!) for the Portuguese band and all bands, a covered area for children and for declamation.


main proposals: a bench
monumental mosaic decorated ceramic or by a local artist on the "sidewalk" between two parties currently in the crossroads and effort on security (in particular to enable the police beyond the wrongdoers to continue them).

4. Rue du Fort (streets and celery and Fortifications)

If the municipality carries out its plan to reverse the way (motor vehicles could therefore descend from the street but more Théodore Verhaegen back) people want to reflect on the consequences of a pedestrian (in front of the Brasserie Verschueren):
The Street Fort is not a highway,
(s) and route (s) of transit,
The dynamic market and shops (that are sick) ...

Residents also made suggestions:

animation Street and market by population (art project),
a "digital street"
a neighborhood newspaper (and why not for the entire district contract)
expo / video testimony of the inhabitants of the neighborhood (information and awareness),
improve street lighting, the
verdurisation / revegetation,
people also require public restrooms (near the church), garbage (with sorting), and additional locations for parking bicycles.

Main proposals: A journey
valuing local heritage.
Consolidate sustainable space dedicated to pedestrians and children's games (like Street Crickx in summer) in the streets of Celery and Fortifications.
Animation Art Street and stories for children. Evidence
video
Expos regular (and projections and banners on the street)
Street Digital
Street Party People

5. The Barrier
The wall of the school of the Daughters of Mary to redecorate:
a fresco is often mentioned) on Park Avenue, Moris
a column for the display of cultural information.

main Proposal: A tour highlighting local heritage.

6. Rue des Villas
(at the intersection of the street of Garibaldi and the Chaussee d'Alsemberg)

of verdurisation / revegetation,

main Proposal : Reduce traffic pressure while leaving the opportunity for businesses to host their customers motorized.

7. The tip of the rue Jean Robie:
Another area unsafe and poorly designed to redevelop space wonderful ... but how?

of verdurisation / revegetation.

main Proposal: brighten the space.

8. Street Lisbon

Accentuate the vegetation and enhance the block party.

main Proposal : To make the semi-pedestrian street, or give it a residential character (area 20).

9. School 1-2 in the Rue du Fort

Accessibility late in the day, on weekends and school holidays.

main Proposal: Accessibility framed to neighborhood youth.


of the proposal

Since the start of meetings with residents, it appears that the desire to be involved in a motor must the neighborhood.
We defined 5 objectives that are measurable in terms of quantitative and qualitative key moments of the process:

1. Proximity to the public and the expertise of local actors;
2. The active participation of citizens;
3. Reclaiming their living space, public space;
4. The fight against incivility;
5. The promotion of cleanliness and urban citizenship;
6. Enhancement of the expression and capture the collective memory;
7. Enhancement of local heritage
8. Promotion the district contract (information and citizen awareness).

The idea is that aspects concerning the more practical aspects (lighting, the verdurisation, management of public space (including benches monumental) and roads ... and, of course other more technical aspects are borne by the municipality.

THE MAJOR PROJECT

1. Rue du Fort and surrounding
Participation, awareness, cohesion
The Defense Committee of San Gilles, the CAFA and Pianofabriek worked together on a project in the Section 5 of the Contract Area Park Alsemberg.

result, global and elicits participation of the people to raise awareness of the Contract Area and to get them to invest in it.

Citizen participation is not necessary "self", of course. The public often need a push to mobilize and collaborate with government. He does not want people to invest themselves: an all-boxes or information via a publication is not enough, far from it. This is particularly true for the most fragile, lower.

Our partnership is committed to make every effort to contact residents of the Rue du Fort and surrounding areas to unite as broadly as possible to boost and sustain the project.

The idea is to find the echo broadest possible so that residents (and associations) appropriate inflections of the Contract Area.

Our purpose is to invite people to think together creatively on their immediate surroundings ... also reflecting on the impact of their ideas on other nearby neighborhoods.

We want from the residents' perceptions of past and present of their neighborhood to bring to the table their vision of the development they would like to see print in the (near) future. We want to actually give an image, a photograph of the rhythm of the district as perceived by the lighting of the past and relate to the perception of people currently in its evolutionary aspect.

In light of past and current configurations of the Rue du Fort, we would like to illustrate the dreams, ideals and frustrations of everyone - residents and users - through their stories. We imagine

organize festive events for these stories and expressions.

practice, through advocacy and citizen participation in community life in all its diversity, we hope to contribute to these goals.

We also want to consolidate these interactions, the networks between individuals, associations, organizations and communal services.

PHASE 1: Preparation and networking
May to September 2011

We want to work on a plan communication where the different stakeholders (residents, local workers, residents, ...) can imagine how to optimize the local fabric. We think of older people, children, people who could speak a vision of urban neighborhoods. But also to barges that come to market.

We asked several neighborhood associations to extend partnership - including the Children's House, the workshop's web Constant Entraide Saint-Gilles, ...

This phase will be an opportunity to take an inventory of different local aspects: the tender and commercial catering, strengths and weak local mobility, cleanliness, safety, housing quality, ... The goal is to make an inventory and current living.

To do this, we would like to develop instruments to facilitate and promote communication:
a local newspaper, a digital map of the street, an educational tour, a blog, posters, stand legally on the market ...

We will renew this project in September 2011 calling on all persons concerned to come forward.

PHASE 2: Call for Ideas
From October 2011 to May 2013

actions are directed to and from the target groups, we hope to meet the key players in the area, working with local associations, conduct market surveys, create a log neighborhood (digital), an educational tour (including collaboration with schools, youth centers, cultural center near the associations), ...

PHASE 3: A block party recurrent

May 2012 May 2013

During this phase, the various aspects of this participatory approach that has been gathered will be presented at a neighborhood party. The actions of the various phases (from 1 to 3) will be submitted to the public (pedestrians, local residents, walkers, ...) to determine the (possible) extensions for the residents of Fort Street and surrounding streets. The multiplier effect is here looking for: participation becoming deeper and wider on the basis of material collected.

PHASE 4: Reporting
June 2012

The achievement of a final report on first three phases to the attention of the municipality, the Region and Beliris end device.

This review will include the elements that can influence the thoughts on the future development of the street and around the Fort on the occasion of a closing event.

STEP 5: Work in progress
June 2012 to November 2013

Based on the evaluation of the first phase, new entertainment district and workshops - a continuation of work already done - will be up (experience log, blog, animation market and tours would be prosecuted).

STEP 6: Evaluation and sustainability
November 2013 to January 2014


The purpose of this whole program is obviously aimed at restoring a color more human, qualitative, social area and ensure continued momentum.

us detail other aspects of the program based on the same phasing:

2. Both benches and boat

Through the development of this project, residents want to develop a draft verdurisation, a project for street cleaning "Salongo" festive activities.

3. Street Lisbon

The street is already very dynamic since a block party is held each spring. The look festive and friendly would be strengthened.

4. Educational tour of the perimeter

We propose a walk / learning path for all audiences but also so privileged with schools (there are 3) and local associations.

could possibly digitize a comment on the net (audio or written) to allow pedestrians to walk alone. They could download a routing.

A teaching document is also designed as a booklet with photographs, drawings, comments made in a workshop with school children, young people attending associations, senior citizens, ...

The project would be accessible to children about the heritage, the environment and their neighborhood. It could possibly spill slightly from QCD to "open up" the inhabitants of their world (see article, "Ways of seeing" 114 pp 50-53 [2010]). One objective is to invest in modern life.

The neighborhood associations are also invited ... The brochure would also take over the socio-economic data.









Nonprofit Budgeting Project, artistic and citizen.

Throughout the program the district contract, it is difficult to assess the popularity and public associations. However, given the evidence we were able to clear the field for many months, residents, artists and associations are "seekers" of participation to revitalize neighborhoods.

We have contacted this title The Children's House, Eco & Co, Atelier Web, Constant, De
Toet, Entraide Saint-Gilles, the ONE, the IFJ, Ateliers Claus, the new Sustainable district, the "Salongo" Hisapno-Belga, schools and other perimeter ?....

Therefore, in terms of demand, we stop the estimation symbolically Budget in June 2012 to assess and revisit more refined the budget to devote to this component.

It seems reasonable to ask for an envelope "open" to stick closer to the realities on the ground and able to articulate actions with the direction to the authorities as to the residents.

If, in principle, the BILD and other bodies with authority in the matter could rule on the principle for the program, a budget could be reviewed and more specific proposals. A basic investment of 28,000 € each year does not seem excessive - less than 0.6% of the total budget at all.

The application was accepted positively. The record, although not definitively tied, was given to authorities.

In the device, the partnership also calls on the project worker, time, equipment and infrastructure that are in operation in investment capital that can be counted.

If the tentative agreement is achieved, the CAFA, the Pianofabriek and Defense Committee of Saint-Gilles could stop by 1 April 2011, for example, a specific framework, set the carrier associations and refine specific budget lines.

Wednesday, February 16, 2011

Bump From My Lip Piercing

VERHAEGEN (PARTIAL) A ONE WAY: YOUR OPINION

THE MEETING "VERHAEGEN A WAY IN UP TO BE HELD ON 02.23.2011 19.30.
The address of the meeting will be communicated on this blog and in mailboxes this Monday, 02/21/2011.

Watch Free Streaming South Park

VERHAEGEN THEODORE WAS ALREADY THE WAY TO STRIKE 02/28/2011

The one-way street from the start to the Barrier Sterckx on a trial basis from 28 February. A meeting is scheduled at the initiative of the Defense Committee of Saint-Gilles with traders (and people) involved this Wednesday, February 23, 2011 at 19.30 hours. We invite the alderman for economic development and the support of mobility and public works. We know that the town appreciates only modestly this way "imposed" by the STIB in the top of Rue Théodore Verhaegen. This is an opportunity to present the concerns of each other and ds and share practical difficulties that traders (but not only) will meet for sure.

Schedule For Rikers Island

STIB SUSPENDED: REALLY?


Following an incident between a driver and a subway passenger, a strike paralyzed the entire network of public transport this Tuesday, February 15, 2011. On Monday 14, already, soon after the altercation, the subway had stopped running.

Without going into the circumstances of the dispute, Justice and STIB looking for now, we stigmatize once again the lack of transparency and very poor communication from the STIB.



Indeed, on Wednesday morning, several subway stations were inaccessible, contrary to what the radio announced as early as 6.30 am. The website of the STIB himself "informed" that "All our subways, trams and buses run normally this Wednesday, February 16.


The above photo was taken at the station Yzer to 7.32 hours. No access was open. Only shortly before 8 o'clock I could cross two workers STIB I therefore questioned. Their attitude and response were strictly insolent. To my question why the station was inaccessible, I was answered that they had to open, hold! " in a mocking tone, without even looking at me. There are, to say the least, a big effort to make training on the politeness of officers who tarnish the reputation of the already dismal service transport.


Meanwhile, passengers, continued to take the escalator to go up immediately (with the flaps closed unperturbed).

Tuesday, February 15, 2011

Thick Chunky Cervical Mucus Pregnancy



My choir class at the University of Montreal gave a concert Friday (coming) February 18 to 19:30. It was at St. Viateur Church in Outremont, 1175 Laurier Avenue West.


Larger Map



Canadian Music Choral works of the twentieth and twenty-first centuries in North America

Editor Raymond Perrin
Myriam Bernard, piano *

. Alleluia (1940) for chorus a cappella Randall Thompson (1899-1984)

. O Magnum Mysterium (1994) For chorus a cappella Morten Lauridsen (b. 1943)

. What hath night to do With sleep? * Excerpt from Night Music (1985) for chorus and orchestra Derek Holman (b. 1931)

. To these men (creation) * On a text by Victor Hugo for chorus and string orchestra Vincent L. Pratt (born 1987)

. If I had the boat * Extract Songs from the Newfoundland outport (1968) for choir and piano Harry Somers (1925-1999)


It's free and you are welcome!

Sunday, February 13, 2011

Does Anyone Use Glory Holes

SURVEYS PUBLIC "revert" VISIBLE

We had echoes: until recently, there was a way to have the title public inquiries line at the website of the municipality. And content summary demand for planning permission. Lately, these "reviews" of investigations there are more comprehensively . It must still find that the evidence available on the net do absolutely no details or identify the issues of records subject to public inquiry.

That said: it is not mandatory. But it would still while a file is available online in its entirety (including plans ), in the interest of all. Where, indeed, the need to keep a secret on aménagemets inevitably have effects for everyone?

We had feared that, like the municipality of Anderlecht, the commune of Saint-Gilles's intention to "copy" the opacity of some of its neighbors. We have therefore asked the department Planning. The words are reassuring: all this is due to a computer problem that will be corrected as soon as possible.

Saturday, February 12, 2011

Chest Infection Every Time I Ge

Compensatory loss of income

You are the victim of nuisance caused by public works? Under certain conditions, you are entitled to compensation for loss of income.

This allowance system was introduced by the Act of December 3, 2005, recently amended by Act of 22/12/2008 program.

The compensation of lost income is exclusively for the independent who meets the following criteria:

► The institution in which the independent works and who suffers harm must occupy less than 10 workers;

its annual turnover and annual balance sheet total must not exceed 2 million;

► Its main activity is to be the direct sale of products or offering services to consumers or to small users for which a direct, personal contact takes place, under normal circumstances, within a facility built; ►

should not have other earned income than its activity in the institution suffers nuisance the work.

What are the requirements to obtain this benefit?

To get it, the nuisance caused by work must make the opening of the facility unnecessary operational point of view for at least 7 consecutive calendar days.

The facility in which the work must necessarily be independent fermé.Par "nuisance" means a situation resulting from work in practice, obstruct, prevent or impede access to the institution where the work 'independent.

This means that at least one the following conditions is met:

no public parking can not be used on the streets of the institution; ►
no public parking can not be used on the streets of the institution;
► no Public parking can be used within a radius of 100 meters around the access to the facility;
► driveway to the hotel is closed to through traffic in one direction or both directions;
► pedestrian access to the property is impossible.

How much allowance?

It amounts to € 71.64 per calendar day (indexed from 1 January 2011 based on Article 8 § 2 of the Act of December 3, 2005). The amount is indexed on 1 January each year.The compensation is due until the 8th day after the closing date of the establishment impeded.

The maximum duration is 30 calendar days, with possibility of extension (s) so that the entire period in which the institution suffers harm is covered.

What is the procedure to obtain compensation?

You must: ►

request a certificate from the common nuisance (using the correct form) as soon as she informs you of the work;

► Participation Fund to introduce at least 7 days before the closure of the application compensation (using the correct form);

► Participation Fund to introduce at least 7 days before the closure of the certificate of nuisance issued by the municipality.

For more information:

Participation Fund
Street Line 1


1000 Brussels Tel. : 02/210.87.91
Fax: 02/210.87.02 E-mail
: info@fonds.org
www.travauxpublics-independants.be
www.fonds.org


site desPME independents and also a page interesting frequently asked questions. Click here (it's the end of text).

Friday, February 11, 2011

Thank You Poem For Donating Kidney

THEODORE VERGHAEGEN IN WORK END 2011


When Brussels mobility study done in 2009, the state of the current traffic is estimated to 7,700 vehicles per day crossing the street Théodore Verhaegen.


STIB has found that for the tram 81 there was 4,100 passengers per direction in 2009.


Vivaqua we outlined the status of sewer collapse and the risk of collapse during the work of the STIB if this was not done before.


The works would be in the best case for 1yr ½. Vivaqua begin later this year changing the connections and then put the shell under the tracks.


Their access to the sewer is currently very difficult because the main entrances are located between channels. During the first phase of work, trams will continue to circulate as to change connections of the houses there is no need to open the street. In the draft, is expected to have access to sewers by parking next to the tram tracks.


Once done, STIB will begin work. The rails will break so that the vibrations caused by the passage of trams not disturb the residents. It is planned to put under the rails a rubber mat and then a beam containing the rail confined to the rubber.


The break itself would last 3 to 5 months according to the representative of the STIB Jean-Michel Mary. The work will be by section.



Fort Street to the Parvis de St Gilles is one way the other way late February early March 2011 for two months: this is a test before making a decision final.


Villo The issue was raised and Cambio. People wonder where the stations will eventually be placed.


It is not certain that the proposed plot called "two schools" be incorporated into the project. It is possible, indeed, that the district contract Alsemberg Park wants to take him out to advance more quickly. It is a reflection which must be further refined.


is planned 53 trees in total, hornbeam (Carpinus betulus ). 14 will be slaughtered, while 13 new ones will be placed in the street Theodore Verhaegen and 10 others on local roads.


Traders are worried about these works and their impact on their businesses. Someone from the town will see each merchant to discuss with them the problems they will encounter when working to find solutions.


In this situation, there are federal subsidies for traders. But the town is well aware that they are not sufficient to offset the shortfall.


Work should begin in late 2011 (by replacing the sewer). STIB begin its work, in spring 2012. In all, the site is expected to last a year and a half (but we believe it is wiser to assume that it will last until end 2013: there are always unforeseen events that cause delays).



The town invites residents to submit their comments to the Planning or during the commission of conciliation on 22/03/11.


For more information, plans, notes, and the incidence ratio are available here .


You will also find on the communal site information (rather incomplete) on the public inquiry. Here is the link .


The Defense Committee of Saint-Gilles in turn will also cause a meeting with merchants to determine what problems they encounter fear.